Roger Civil Engineering -
River Ouzel

 
 

Project details

  • Installation River Ouzel – 2x225mm and 2x125mm SDR11 Black Electric Duct in 3m separation, 6m depth and 100m length

  • Ground conditions – clay

  • Drill Rig Utilised – JT40

  • Project duration – 1 week

  • Completed on time

  • Pumpable Slurry removal

  • Pipe welding – pipe supplied in 12m sticks

  • Environmental risks due to River Ouzel