JSM -
M25 London
Project details
November 2024
Client – JSM Construction Limited
Location – M25 London
Project Description
Flowtek have successfully recently completed a complex drill under the M25 installing double 132Kv Circuits.
The works involved full design and build utilizing our brand new Vermeer MR1000 and D100x140. The HDD’s consisted of 3 x 180mm and 1 x 110mm Electric by 270m.
Flowtek utilised Brownline with a Gyro and Steering Engineer to achieve the pilot to pin point accuracy and SlimDril for a Mud Motor with the second pilot due to ground conditions.
Flowtek utilised our D100 x 140 Vermeer Drill Rig, MR1000 Mud-Recycler and associated equipment.
Suppliers utilised on this project, RTS for removal of slurry, Wolseley for Fusion Hire Equipment, GAP for welfare facility/20t excavator/ generator, Vermeer UK for drilling additives and Slimdrill for Mud Motor.