Canal Crossing
Project details
Installation Canal Crossing - 2x225mm and 2x125mm SDR11 Black Electric Duct in 3m separation, 6m depth and 120m length
Ground conditions – clay
Drill Rig Utilised – JT40
Project duration – 1 week
Completed on time
Pumpable Slurry removal
Pipe welding – pipe supplied in 12m sticks
Environmental risks due to Canal